安平县宏州五金丝网制品有限公司,99在线精品国自产拍不卡,中文字幕日本无码电影,国产亚洲精品第一区香蕉},在线观看国产区亚洲一区

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Project Synthesis Division first building block hoisting steel
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://azshop.cn

Guangzhou Steel News: Project Synthesis Division first building block hoisting steel

Time:[2015-6-13]  Hits:5993

Guangzhou Steel News: Project Synthesis Division first building block hoisting steel

Lifting command followed by a crisp whistle, a formal lifting steel building blocks. The sound of firecrackers, oil synthesis A Lot exhaust decarbonization unit, two steel structure building blocks of a total weight of 86 tons a steadily lifting module, launched.

    Exhaust decarbonization unit steel frame structure constructed two total height of 69.5 meters, in order to reduce the risk of installation, saving construction costs of labor, machinery, and other aspects of erecting erection, ten construction projects Shenhua Ningxia Coal Ministry through planning, we decided to take the floor and modular assembly Lifting mode. Each module is all assembled on the ground, including all the ladders, railings, steel grating and all other intermediate coat and topcoat construction and corrosion work, then hoisting respectively. The lifting module a structure the size of 7 × 8 × 14.3 m lifting height of 44.8 meters.

    Before lifting, for all personnel involved in the project department conducted safety tests, lifting, lifting the entire process lasted 35 minutes, the module in place a stable altitude of 45 meters, and for the next module lifting laid the foundation. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號